OpportunitiesCompaniesEventsCommunitiesJobsResourcesPricing
Log InJoin GovConUnited Free
← Back to opportunities
GOV
Federal notice via SAM.gov Department of Energy

Kautz Road Substation Construcion, Uip Subproject 2- KRS

Notice title: KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
No Set aside used
AgencyDepartment of Energy
Subagency / OfficeDepartment of Energy / Fermilab - DOE Contractor
Notice TypeSolicitation
Solicitation NumberRFP-383167-CD
NAICS Code237130
PSC CodeZ2MZ
PostedNovember 2, 2026
Response DeadlineDecember 18, 2026
Performance LocationBatavia, IL
View original listing on SAM.gov →

Notice Description

This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.

Attachments

Contacts

  • Chris Daley (Primary) · cdaley@fnal.gov · 6308404256

Capabilities Sought

  • Relevant technical capability and customer experience
  • Qualified personnel and scalable delivery capacity
  • Documented quality, security, and compliance practices
  • Competitive rates and responsive teaming support

Partner Response

Responses to this opportunity are submitted through SAM.gov — GovConUnited doesn't collect or forward them. Follow the notice's instructions on SAM.gov to express interest or respond.